Utility Cabinet wiring

Utility Cabinet wiring

Customer need: Reduce the time required for prototype wiring process as much as possible.

MEC solution: Defining wire paths on a digital model in parallel with the mechanical design enabled early production and exact fit. Time required from the start of the wiring process to completion was reduced from four weeks (including rework) to just two days.

 Customer: Hp-Indigo